HOME | www.bluewater-offshore.com
Glas Dowr FPSO
Bluewater’s FPSO ‘Glas Dowr’ commenced production on 7 August 2003
on the Sable field.
Click to Download Sable Project brochure.
(Adobe Acrobat format).
In June 2001, Soekor E & P (Pty) Ltd. of Parow, South Africa (integrated into the Petroleum Oil and Gas Corporation of South Africa (PetroSA (Pty) Ltd. and partner Pioneer Natural Resources South Africa (Pty) Limited awarded Bluewater a contract to provide and operate production facilities for the Sable Field in the Bredasdorp basin off South Africa.
Sable’s initial development plan includes four production wells, one water-injection well and one gas-injection well. Before installation at the Sable field, the vessel’s production and processing facilities are being modified to fit the characteristics of the field’s hydrocarbons. Design capacities are 40,000 bopd processing, 80 MMscfd re-injection, and 45,000 bwpd injection.
Bluewater’s FPSO ‘Glas Dowr’ commenced production on 7 August 2003 on the Sable field. See Press Release
The ’Glas Dowr’ is the fifth Bluewater designed, built, owned and operated FPSO first commencing operation in August 1997 on the Durward & Dauntless Field for Amerada Hess.






Site last updated :
10 June 2010
LEGAL NOTICE
© Bluewater, 2002.
All rights reserved.
site designed and produced by maxandco www.maxandco.co.uk