HOME | www.bluewater-offshore.com
Tandem Offloading for LNG
Bluewater has developed a tandem offloading system specifically for the offloading of LNG from an FPSO to a non-dedicated LNG carrier. All that is needed is an additional quick and low-cost modification to the LNG carrier manifold.

Download Conceptual Animations
Shallow Water LNG Terminal Equipped with Large Bore Cryogenic Hoses

Shallow Water LNG Terminal Equipped with Marinised Conventional Loading Arms
The concept builds on proven oil industry tandem offloading operations. Model tests at MARIN have demonstrated that offloading in environmental conditions up to 6-metre significant wave heights is feasible. A high volume redundant flow path provides the necessary robustness.
The tandem offloading unit itself, given the work name BIG SWEEP, is a self-positioning unit, which maintains station just off the side shell of the LNG carrier. This approach allows the use of either flexible loading hoses or conventional steel loading arms.
The ‘BIG SWEEP’ concept is also under development as a Shore Terminal, with or without a re-gassification plant.






Site last updated :
10 June 2010
LEGAL NOTICE
© Bluewater, 2002.
All rights reserved.
site designed and produced by maxandco www.maxandco.co.uk